Weekly Update 8/16/19

Holiday moratorium exemption request received from Metro.

On July 31, the City received a formal request from Metro for an exemption to this year’s holiday moratorium, which would allow work to continue after the Thanksgiving holiday through New Year’s Eve. No work would occur on Thanksgiving Day, Christmas Day, or New Year’s Day. The project anticipates going to City Council for a decision in September.

Wilshire/Rodeo Station

Utility work and potholing continues on Wilshire.

Potholing, relocating sewer and water lines, and replacing storm drain laterals on Wilshire are in progress between El Camino and Crescent. Work will be done in stages over the next three months and will require some turn restrictions and closures of traffic lanes, crosswalks, and sidewalks. Work hours are weekdays from 9 am to 4 pm and 8:15 pm to 7 am. On weekends, work hours are from 8 am to 8 pm, with noisy activities restricted to 10 am to 6 pm.

Geotechnical instrumentation installed near Wilshire/Rodeo.

Devices to monitor the effects of excavation and tunneling will be installed at multiple locations around the future Wilshire/Rodeo station. This work will be performed intermittently on weekdays from 7 am to 4 pm over the next few months.

N. Cañon closure begins September 9.

As early as September 9, N. Cañon will no longer be accessible from Wilshire. A 20-foot soundwall will be installed at the intersection of N. Cañon and Wilshire in an effort to mitigate traffic and noise for a minimum of two years during major construction. N. Cañon will be reconfigured into a cul-de-sac while pedestrian access will be maintained on both sides of the closure. Sidewalk closures and parking impacts may be required during installation of the closure. Work hours will be weekdays from 7 am to 4 pm and weekends from 8 am to 6 pm.

Canon Closure 8-16-19

Piling installation to begin in September.

Piling operations are anticipated to begin as early as September 23, 2019. During this work, a rig will be used to drill holes 100 feet below the surface all around the future Rodeo station box. A crane will lower steel beams into each hole, then the hole will be backfilled with concrete to provide support during excavation for the station. This activity will require full-time lane closures on Wilshire and some weekend closures at the Beverly and S. Cañon intersections. K-rail barriers will be in place 24 hours a day, seven days a week through the completion of this work, which is expected to be May of next year. Two lanes of traffic will remain open in each direction on Wilshire during this work. For more details, please see Metro’s latest construction notice.

Wilshire/La Cienega Station

Closures anticipated near Wilshire.

The following closures* are scheduled to take place during the upcoming week:

  • North Gale will be closed from 6 am to 10 pm on weekdays and Saturday.
  • Curbside and middle lanes in both directions on La Cienega near Wilshire will be intermittently closed from 9 am to 3:30 pm on Wednesday through Friday.
  • Wilshire will be reduced to two lanes in each direction from La Cienega to Carson from 6 am to 10 pm on Saturday and Sunday.
  • Eastbound Wilshire from Gale to San Vicente and westbound Wilshire from San Vicente to Tower will be reduced to one lane from 8 am to 7 pm on Saturday. Parking on Wilshire will also be restricted.

Please use alternative routes and continue to respect construction barriers and detours for your safety.

Concrete and material delivery begins in September.

Next month, excavation is expected to be completed and construction will begin on the La Cienega station including concrete placement and material deliveries such as rebar. To support this work, Wilshire will be reduced to two lanes in each direction from 7 am to 4 pm, and one lane in each direction from 10 pm to 7 am. Parking and turn restrictions will also be required.

*Due to the dynamic nature of construction, all dates and times are subject to change.

Current project construction map »

Related Projects

Metro seeking input for First/Last Mile Plan.

Want to get involved in Metro’s planning for accessing future Purple Line Extension subway stations? Take their online survey and make your voice heard on how to make getting to and from the new stations easier and more pleasant. The planning is expected to wrap up this fall.


The Purple Line Extension will provide a transportation alternative to the congested Westside, including two stops in Beverly Hills: Wilshire/ La Cienega and Wilshire/ Rodeo.

Purple Line Project Map 2019



Sections 1 and 2: La Cienega Station and Rodeo Station Monthly Update Meeting

When

Wednesdays in 2019: Sept 4, Oct 2, Nov 6, Dec 4

Time:

6:30pm - 8pm

Where

City Hall, Municipal Gallery (455 North Rexford Drive, Beverly Hills, CA 90210)

Description

This is a series of monthly meetings for Beverly Hills stakeholders interested in Metro construction for the Wilshire/La Cienega and Wilshire/Rodeo Stations in Beverly Hills.  

Detailed City Council agendas and meeting videos can be found at http://www.beverlyhills.org/departments/informationtechnology/beverlyhillstelevision/citycouncilmeetings/

Additional information can be found at https://www.metro.net/projects/notices/events_purpleline/

Transportation and Parking: For public transportation, use the Trip Planner at metro.net or call 323.GO.METRO. Two-hour free parking is available at the Civic Center Garage located at 450 N. Rexford Dr.


Links

Metro Presentations: For the latest Metro Presentations, please click this link below and select "Section 1&2: City of Beverly Hills Presentations"


Documents and Presentations

  • MOA Compliance Report
    The Independent Compliance Monitor is required to be on-site for all construction activities to monitor permit conditions and MOA requirements, such as noise compliance, hauling and parking.  Weekly reports are submitted for Section 1 and 2.

  • Contact Log
    The attached logs track contact interactions such as phone conversations, emails and letters for Section 1 (Wilshire/La Cienega) and Section 2 (Wilshire/Rodeo). Metro and the City keep separate contact logs.
  • Claims Process
    As part of the Memorandum of Agreement between the City of Beverly Hills and Metro, Metro is required to maintain an administrative claims process. Residents and businesses may file a claim for damage caused by the contractor during construction of the Purple Line Extension by contacting Metro to complete a field report at purplelineext@metro.net or via telephone at (213) 922-6934.

    You will need to provide the following information: current address, telephone number, date and time of the incident, and a detailed narrative of the incident and any damages incurred. The field report must be completed by a team member of the Metro Purple Line Extension at the email or phone number provided above.

    Please contact Perla Berry with the City of Beverly Hills Project Team at (310) 288-2840 for assistance with submitting a claim to Metro.

    Metro will provide the City with monthly updates on the claims that were filed by residents and businesses.

    Sample Field Report for Reference

BUSINESS RESOURCES

Metro Business Interruption Fund (BIF) information and additional resources for your business: https://www.metro.net/projects/business-interruption-fund/ 


PROJECT DETAILS - Purple Line

The project is scheduled to be built in three sections.  The first section of the Purple Line Extension will extend the subway from the Wilshire/ Western station in Los Angeles to Wilshire/La Cienega in Beverly Hills.  Section 2 extends from the Wilshire/ La Cienega station to the Wilshire/ Rodeo station and then on to the Century City / Constellation station. 

 

 
  • City of Beverly Hills Shield
  • City of Beverly Hills
  • 455 North Rexford Dr
    Beverly Hills, CA 90210
  •  
  • (310) 285-1000
  • Monday-Thursday 7:30AM-5:30PM
  • Friday 8:00AM-5:00PM
© Copyright 2019, City of Beverly Hills. All Rights Reserved.